Volume 44 | Number 4 | Year 2017 | Article Id. IJMTT-V44P537 | DOI : https://doi.org/10.14445/22315373/IJMTT-V44P537
Several construction activities can be managed to achieve the profit within limited resources and time. A resource such men power, material, machines, shopping facilities, finance etc. That is required for completing various activities in a project. Thus project management techniques are useful in scheduling and coordinating the various resources by project management can be used to resolve to resource conflicts and also useful in minimising the project duration with in limited availability of resources to make the project profitable. The aim of this paper has to analyze the available resources, then allocating them with levelling and smoothing of the resources by histogram and time scale activity table within certain duration in project.
[1] https://www.abebooks.com/book-search/title/operations- research/author/verma-p/operation research by A.P. Verma
[2] 1993 Alan stretton- A short history of modern project management. https://www.pmworldtoday.net second edition October 2007(vol. IX, issue X.
[3] teedinguru.com/blog/2014/12/.../operation-research-by-kanti-swarup
[4] "6.6.2.4 Resource Optimization Techniques". A Guide to the Project Management Body of Knowledge (PMBOK® Guide) (5th
ed.). Project Management Institute. 2013. p. 179. ISBN 978-1-935589-67-9.
[5] SimulTrain Resource Leveling https://www.youtube.com/watch?v=xcOD_ViGJYg
[6] Triant G. Flouris; Dennis Lock (2009). Managing Aviation Projects from Concept to Completion. Ashgate Publishing, Ltd. pp. 207– . ISBN 978-0-7546-7615-7.
[7] "Availability Planning". CEITON. Retrieved 2014-06-04.
[8] Project management with CPM and PERT,2/e, van Nostrand, new York (1970)
[9] https://www.ijsr.net/archive/v4i5/SUB154213.pdf by R. joshi.
[10] https://www.apm.org.uk/resources/...resource/difference-between-resource-smoothing...
[11] https://en.wikipedia.org/wiki/Resource_leveling
[12] Samuel90 (2013-01-250 “RESOURCE ALLOCATION”.slideshare.net.
[13] N. B. Rathod and K. K Kanani, k-cordiality of Path and Cycle Related Graphs. Int. J. of Math. and Comp. Appl. Res., 5(3), 81- 92(2015).
[14] J. Gross and J. Yellen, Handbook of graph theory, CRC Press(2004).
[15] J. A. Gallian, A dynamic survey of graph labeling, The Electronics Journal of Combinatorics, 18(2015).
Sujata Bala, Dr. Sahdeo Mahto, "Resource-allocation by histogram and time scale method with PERT and CPM," International Journal of Mathematics Trends and Technology (IJMTT), vol. 44, no. 4, pp. 263-269, 2017. Crossref, https://doi.org/10.14445/22315373/IJMTT-V44P537