Volume 10 | Number 1 | Year 2014 | Article Id. IJMTT-V10P510 | DOI : https://doi.org/10.14445/22315373/IJMTT-V10P510
In this paper, we proposed to find the optimal duration of fully fuzzy time- cost trade -off problem using type-2 Trapezoidal fuzzy number. An illustration is provided to demonstrate the efficiency of the proposed method.
1. Feng-Tse Lin, Time-Cost Trade-Off problem based on confidence- Interval estimates and level (1-α ) Fuzzy numbers. International Journal of Innovative computing, Information and control vol 4 No-10, oct 2008, 2551-2564.
2. Hisdal.E. The “IF THEN ELSE” Statement and Interval valued Fuzzy sets of Higher type. International Journal of Man-Machine Studies15 (1981),385-455.
3. Jhon.R.J. Type-2 Fuzzy Sets an Approach of Theory and Applications. International Journal Fuzziness knowledge- Based systems 6 (6) (1998), 563-576.
4. Pan, H. and C.H. Yeh, 2003, “ Fuzzy project scheduling” The IEEE International conference on Fuzzy systems, PP.755-760.
5. Rehab.R. and R.I. Carr, (1989) “ Time-Cost Trade Off among related activities,’ Journal of construct Engineering Manage, 115: 475-486.
6. Shakeela Sathish. “ Fully Fuzzy Time-Cost Trade-Off in a project network. A new approach, International Institute for Science, Technology and Education, Vol 2, No.6, 2012, PP. 53-65.
7. Shih-pin chin et.al., Time-cost trade off analysis of project networks in fuzzy environments . European Journal of Operational Research, Volume212, Issue 2, 16 Jult 2011, 386-397.
8. Stephan-Dinagar, D.Anbalagan.A., Fuzzy Programming Based on Type-2 Generalized Fuzzy Numbers, International Journal of Mathematical Science and Engineering Applications. Vol-5, No.IV (July 2011), PP 317- 329.
9. Younes Saeinia et.al., Time-Cost Trade-Off in Fuzzy projects with constrained consumable resource, Journal of applied Science Research 8(4), 2253-2259, 2012.
10. Yousefli.A., M.Ghazanfari.A.Shahanaghi and M.Heydari, 2008 “ A new heuristic model for fully fuzzy project scheduling, “ Journal of Uncertain Systems 2(1): 75-80.
11. Zadeh. I.A. The Fuzzy concept of a Linguistic variable and its Applications to Approximate Reasoning. International Journal Inform Science 8 (1975), 199-249.
R. Helen, R.Sumathi, "Time-Cost Trade-Off Problem Using Type-2 Trapezoidal Fuzzy Numbers," International Journal of Mathematics Trends and Technology (IJMTT), vol. 10, no. 1, pp. 51-59, 2014. Crossref, https://doi.org/10.14445/22315373/IJMTT-V10P510