Volume 49 | Number 4 | Year 2017 | Article Id. IJMTT-V49P538 | DOI : https://doi.org/10.14445/22315373/IJMTT-V49P538
Gulbanu Pathan, P.H.Bhathawala, "Mathematical Model for Unemployment Control-A Numerical Study," International Journal of Mathematics Trends and Technology (IJMTT), vol. 49, no. 4, pp. 253-259, 2017. Crossref, https://doi.org/10.14445/22315373/IJMTT-V49P538
[1] A.K.Misra, A.K.Singh, A mathematical model for unemployment, IJTPC4,2013 pp.2322-3138.
[2] A.K.Misra, A.K.Singh, A Delay mathematical model for the control of unemployment, Differ Equ Dyn Syst21(3), 2013,pp.291-307.
[3] N.Sirghi, M.Neamtu, D.Deac , A dynamic model for unemployment control with distributed delay, Mathematical Methods in finance and business Administration,Proceeding of the International Business Administration conference, Tenerife Spain, 1,2014, pp.42-48.
[4] M.Neamtu, A dynamic model for unemployment control with migration and distributed delay, Mathematical Methods in finance and business Administration, Proceeding of the International Business Administration conference, Tenerife, Spain, 1,2014, pp.23-31.
[5] N. Sirghi, M.Neamtu , Deterministic and stochastic advertising diffusion model With delay, WSEAS Transaction on system and control, 4(8), 2013,pp. 141-150.
[6] C.V.Nikolopoulos, DE Tzanetis, A model for housing allocation of a homeless population due to natural disaster, Nonlinear Anal.4,2003,pp.561-579.
[7] G.N.Pathan, P.H.Bhathawala, A Mathematical Model of unemployment with effect of self employment, IOSR- JM, 11(6), 2015, pp.37-43.
[8] M. Neamtu, M.Pirtea, G. Mircea, D. Opris, Stochastic , Fuzzy, Hybrid delayed Dynamics Heterogeneous competitions with Product Differentiation, WSEASTransaction on mathematics , 7(9), 2010, pp.581-591.
[9] G.N.Pathan, P.H.Bhathawala, Unemployment-Discussion with a Mathematical Model, IJBMER, 3(1), 2016,pp.19-27.
[10] G.N.Pathan , P.H.Bhathawala, A mathematical model for Unemployment-Taking an action without delay, ADSA, 12(1), 2017, pp.41-48