Volume 4 | Issue 7 | Year 2013 | Article Id. IJMTT-V4I7P1 | DOI : https://doi.org/10.14445/22315373/IJMTT-V4I7P1
The present paper deals with two machine production lines system with state dependent rate. We have used matrix geometric method to determine the state probabilities. These probabilties are used to find out steady state output and average inventory level of production line, which is separated by a finite intermediate buffer. The processing time, inter failure time and repair times of each machine are exponentially distributed. The machines are subject to the blocking as well as starvation due to variability of processing time. The method proposed can be used to develop a suitable algorithm for implementation purpose.
[1]. Neuts, M.F. (1968): “Two queues in series with a finite intermediate waiting room”, J. App. Prob., Vol.5, pp.123-142.
[2] Pinedo, M. and Wolf, R.W. (1982): “A comparision between tandem queues with dependent and independent service times”, Oper. Res., Vol.30, pp. 464-479.
[3] Tsiotrans, G.D. and Badr,H. (1990): “ A recursive methodology for the derivation of the blocking probabilities of tandem queues with finite capacity”, Computers and Operational Research, Vol. 17, pp. 475-479.
[4] Shiue, G.A. and Alitok, T. (1993): “Two stage, multiproduct production/inventory systems”, in: Onvoural and Akyildiz (Eds.), Proc. Second International workshop on queueing networks with finite capacity, Northern Holland, Amsterdam, pp. 213-223.
[5] Daduna,H. (1997): “ Some results for steady state and sojourn time distribution in open and closed linear network of Bernoulli servers with state dependent service and arrival rates”, Perf. Eval. Vol.30, No.1-2, pp. 3-18.
[6] He, Q.M. and Jewkes, E.M. (2000): “Performance measures of a make to order inventory production system”, IIE transaction (Institute of industrial Engineers), Vol.32, No. 5, pp.409-419.
[7] Yue, D.; Li, Chunyan;Yue,Wuye (2006): “ The matrix geometric solution of the / /1 M Ek queue with Balking and state dependent service”, Non-linear dynamics and systems theory,Vol.6, No. 3, pp.295-308
[8] Meerkov, S.M.; Shimkin, N.; Zhang, L. (2010): “Transient Behavior of two machine Geometric production lines”, IEEE, Transactions on automatic control, Vol.55, No.2, pp.453-458.
S.B. Kulshreshtha , A.K. Singh, "Performance Measures for Two Machine Production Line with Finite Intermediate Buffer," International Journal of Mathematics Trends and Technology (IJMTT), vol. 4, no. 7, pp. 107-115, 2013. Crossref, https://doi.org/10.14445/22315373/IJMTT-V4I7P1