In this announcement, a method is analyzed to discover solution of fuzzy CPM and PERT problem by using LR-type fuzzy numbers and their rankingfunction of Padma Bridge in Bangladesh.LR-type fuzzy number with some constructive and simple approximation arithmetic operators defined by Dubois and Prade [1].Abbasbandy and Hajjari [8] introduced a new approach for ranking of trapezoidal fuzzy numbers based on the left and the right spreads at some 𝛼-levels of trapezoidal fuzzy numbersMazlum, Gumeri[16] are solved fuzzy CPM and PERT problem is most recent practicable subject by using triangular fuzzy number. In this project, a method is analyzed to find solution of fuzzy CPM and PERT problem by using LR-type fuzzy numbers and their ranking functions of Padma Bridge in Bangladesh. To illustrate our method, a numerical example is solved.
[1] D. Dubios, H. Prade, (1978),Operations on fuzzy numbers, J. System Sci. 9, 613-626.
[2] T. Chu, C. Tsao, (2002),Ranking fuzzy numbers with an area between the centroid point and orginal point, Computers & Mathematics with Applications, Volume 43, Issues 1–2, Pages 111-117.
[3] L.A. Zadeh, (1965),Fuzzy sets, Inf. Control 8, 338-353.
[4] H.J. Zimmermann,(1991), Fuzzy Sets Theory and its Application, Kluwer Academic Press.
[5] A. Kauffman, M.M. Gupta, (1991), Introduction to Fuzzy Arithmetic: Theory and Application, New York.
[6] Kumar, A., Kaur, J., Singh, P. (2011) “A new method for solving fully fuzzy linear programming problems”, Appl. Math. Modell, Vol. 35, pp. 817-823.
[7] S. Abbasbandy, T. Hajjari, (2009), A new approach for ranking of trapezoidal fuzzy numbers, Computers and Mathematics with Applications 57 413-419.
[8] Bramble, B. B., and Callahan, M. T., (2000), Construction delay claims, Aspen Law & Business.
[9] Chanas, S. Zielinski, P., (2001), “Critical Path Analysis in the Network with Fuzzy Activity Times”, Fuzzy Sets and Systems, 122: 195-204.
[10] J.J. Buckley, (1989), Fuzzy PERT, in Applications of Fuzzy Set Methodologies in Industrial Engineering, Elsevier, 115-125.
[11] Klir, G.J. Yuan, B., (1995),Fuzzy Sets and Fuzzy Logic: Theory and Application. Upper Saddle River, Prentice-Hall, New Jersey.
[12] Aziz, R., (2013), ’’Optimizing strategy software for repetitive software projects within multi-mode resources ’’, Alexandria Engineering Journal, 52:373-385.
[13] Junior, R. and Carvalho, M., (2013), ’’Understanding the Impact of Project Risk Management on Project Performance: an Empirical Study’’, J.Technol.Manag.Innov., 8:64-79.
[14] Baykasoglu, A. Gokcen,T. , (2012) ,’’ A direct solution approach to fuzzy mathematical programs with fuzzy decision variables’’, Expert Systems with Applications, 39:1972-1978.
[15] Lotfi, F.H., Allahviranloo, T., Jondabeha, M.A., Alizadeh, L. (2009). “Solving a fully fuzzy linear programming using lexico grapy method and fuzzy approximate solution”, Appl. Math. Modell, Vol. 33, pp. 3151-3156.
[16] Mazlum, M. Gumeri, A,F. (2015) CPM, PERT and Project Management with Fuzzy Logic Technique and Implementation on a Business, Elsevier, 210, 348-357.
[17] Pillay, A. and Wang, J. (2003) Modified Failure Mode and Effects Analysis Using Approximate Reasoning. Reliability Engineering & System Safety, 79, 69-85.
[18] Kim, J., Kang , C. Hwang, I, (2013) ,’’ A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem’ ’International Journal of Project Management, 30:264-272.
[19] Steyn, J. Stoker, p.,(2013), “Does measurement theory impact Project performance?”, Procedia – Social and Behavioral Sciences, 119:635-644.
Md. Mijanoor Rahman, Mrinal Chandra Barman, Sanjay Kumar Saha, "Fuzzy Numerical Results Derived From Crashing CPM/PERT Networks of Padma Bridge in Bangladesh," International Journal of Mathematics Trends and Technology (IJMTT), vol. 52, no. 9, pp. 603-607, 2017. Crossref, https://doi.org/10.14445/22315373/IJMTT-V52P586