Volume 64 | Number 1 | Year 2018 | Article Id. IJMTT-V64P510 | DOI : https://doi.org/10.14445/22315373/IJMTT-V64P510
The current paper deals with the modeling and profit evaluation of a repairable system working with one operative unit and three cold standby units. Initially, there is single unit in operation which is referred as main unit and three cold standby units. The system works properly as long as the main unit remain in operable mode and whenever the main unit comes at halt, all the cold standby units have to function together to keep the system operating. There is only one repairman available. The reliability and profit evaluation has been done for the current study. Various measures of system effectiveness such as MTSF and Profit are obtained using semi Markov process and Regenerative point technique.
[1] G.S. Mokaddis, S.W. Labib and A. M. Ahmed. (1997), “Analysis of a two-unit warm standby system subject to degradation”, Microelectronics and Reliability, 37, p.641-648.
[2] Goyal V. and Murari K. (1985), “Profit consideration of a 2-unit standby system with a regular repairman and 2-fold patience time,” IEEE Trans. Reliab., vol. R-34, p. 544.
[3] G.Taneja and J. Nanda. (2003) Probabilistic analysis of a two-unit cold standby system with resume and repeat repair polices, Pure andApplied Mathematika Sciences, LVII (1-2), p.37-49.
[4] Parashar, B. and Taneja, G. (2007), “Reliability and profit evaluation of a PLC hot standby system based on a master slave concept and two types of repair facilities”. IEEE Trans. Reliab, 56: 534-539. DOI: 10.1109/TR.2007.903151.
[5] A. Goyal, G. Taneja and D.V. Singh. (2009) Reliability and profit evaluation of a 2-unit cold standby system working in a sugar mill with operating and rest periods, Caledonian Journal of Engineering, Oman,5(1) p.1-5.
[6] Eryilmaz, S., and Tank, F., (2012), “On Reliability Analysis of a Two-Dependent-Unit Series System with a Standby Unit,” Appl Math Comput., 218(15), pp. 7792-7797.
[7] Sharma, U. and Kaur, J., (2016), “Profit Evaluation of Three Units Compressor Standby System”, in International Journal of Advanced Research Trends in Engineering and Technology (IJARTET) ,Vol. 3, No. 05, 26-30.
[8] Sharma, U. and Sharma, G., (2016), “Evaluation of a system for reliability and profit where stand by units functions to accommodate the required demand”, in International Journal of Mathematics Trends and Technology, Vol.-49, Issue-03, pp 178-182.
Shakeel Ahmad, Gunjan Sharma, Upasana Sharma., "Modelling and Profit Evaluation of a Repairable System Working with One Operative Unit and Three Cold Standby Units," International Journal of Mathematics Trends and Technology (IJMTT), vol. 64, no. 1, pp. 65-71, 2018. Crossref, https://doi.org/10.14445/22315373/IJMTT-V64P510