Volume 69 | Issue 2 | Year 2023 | Article Id. IJMTT-V69I2P501 | DOI : https://doi.org/10.14445/22315373/IJMTT-V69I2P501
Received | Revised | Accepted | Published |
---|---|---|---|
14 Dec 2022 | 16 Jan 2023 | 29 Jan 2023 | 10 Feb 2023 |
The purpose of present exploration is to develop a stochastic model concerning consecutive 2-out-of-3: G system. The developed model involves three linearly ordered units A, B and C having persistent failure rates. The repair of recently failed unit is given priority and the system is repaired under pre-emptive priority resume repair discipline. The failure of units is modeled by exponential distribution, whereas repair of each unit follows general distribution. The differential equations of the proposed model are formulated by means of supplementary variable method. Laplace Transform tool is employed for solving the resultant equations. The system's performance metrics, including availability, reliability, mean time to failure (MTTF), as well as expected profit are appraised by considering certain specific cases. The effect of failure of each unit on system performance is also studied. The influence of failure of non-consecutive units A and C on system performance is found almost alike, however it is understood with the help of examples and graphs that the role of unit B is very crucial to system performance.
[1] Balbir S. Dhillon, and Subramanyam N. Rayapati, “Probabilistic Analysis of Redundant Systems with Human Errors and CommonCause Failures,” Stochastic Analysis and Applications, vol. 4, no. 4, pp. 367-398, 1986. Crossref, https://doi.org/10.1080/07362998608809099
[2] Jai Singh, and B. Dayal, “A1-out-of-N: G System with Common-Cause Failures and Critical Human Errors,” Microelectronics Reliability, vol. 31, no. 5, pp. 847-849, 1991. Crossref, https://doi.org/10.1016/0026-2714(91)90022-Y
[3] B.S. Dhillon, and Nianfu Yang, “Availability of a Man-Machine System with Critical and Non-Critical Human Error,” Microelectronics Reliability, vol. 33, no. 10, pp. 1511-1521, 1993. Crossref, https://doi.org/10.1016/0026-2714(93)90105-8
[4] S. Narmada, and M. Jacob, “Reliability Analysis of a Complex System with a Deteriorating Standby Unit under Common-Cause Failure And Critical Human Error,” Microelectronics Reliability, vol. 36, no. 9, pp. 1287-1290, 1996. Crossref, https://doi.org/10.1016/0026-2714(95)00132-8
[5] Mangey Ram, and S.B. Singh, “Availability, MTTF and Cost Analysis of Complex System Under Preemptive Repeat Repair Discipline Using Gumbel Hougaard Family Copula,” International Journal of Quality & Reliability Management, vol. 27, no. 5, pp. 576-595, 2010. Crossref, https://doi.org/10.1108/02656711011043544
[6] K. Goel, Dhirendra Pandey, and A. Kumar, “Transient Analysis of Two Unit Three State System Under Circumstantial and Common Cause Failures,” International Journal of Agricultural and Statistical Sciences, vol. 9, no. 2, pp. 511-518, 2013.
[7] Amit Kumar, and Mangey Ram, “System Reliability Measures in the Presence of Common Cause Failures,” International Journal of Industrial and Systems Engineering, vol. 24, no. 1, pp. 44-61, 2016. Crossref, https://doi.org/10.1504/IJISE.2016.078004
[8] Mangey Ram, and Monika Manglik, “An Analysis to Multi-State Manufacturing System with Common Cause Failure and Waiting Repair Strategy,” Cogent Engineering, vol. 3, no. 1, 2016. Crossref, https://doi.org/10.1080/23311916.2016.1266185
[9] Garima Chopra, and Mangey Ram, “Reliability Measures of Two Dissimilar Units Parallel System Using Gumbel-Hougaard Family Copula,” International Journal of Mathematical, Engineering and Management Sciences, vol. 4, no. 1, pp. 116-130, 2019. Crossref,https://dx.doi.org/10.33889/IJMEMS.2019.4.1-011
[10] S.S. Srivastava, R. C. Garg, and A.K. Govil, “Behaviour of a Complex System with Stand-By Redundancy under Different Repair Echelons,” Microelectronics Reliability, vol. 10, no. 5, pp. 375-380, 1971. Crossref, https://doi.org/10.1016/0026-2714(71)90213-7
[11] M.N. Gopalan, and U.D. Kumar, “On the Transient Behaviour of a Repairable System with a Warm Standby,” Microelectronics Reliability, vol. 36, no. 4, pp. 525-532, 1996. Crossref, https://doi.org/10.1016/0026-2714(94)00183-9
[12] Kuo-Hsiung Wang, and Liang-Wei Chiu, “Cost Benefit Analysis of Availability Systems with Warm Standby Units and Imperfect Coverage,” Applied mathematics and Computation, vol. 172, no. 2, pp. 1239-1256, 2006. Crossref, https://doi.org/10.1016/j.amc.2005.02.052
[13] Mangey Ram, Suraj Bhan Singh, and Vijay Vir Singh, “Stochastic Analysis of a Standby System with Waiting Repair Strategy,” IEEE Transactions on Systems, Man, and Cybernetics: Systems, vol. 43, no. 3, pp. 698-707, 2013. Crossref, http://doi.org/10.1109/TSMCA.2012.2217320
[14] Beena Nailwal, and S.B. Singh, “Reliability Analysis of Two Dissimilar-Cold Standby Redundant Systems Subject to Inspection with Preventive Maintenance Using Copula,” Mathematical Concepts and Applications in Mechanical Engineering and Mechatronic, IGI Global, pp. 201-221. 2017. Crossref, http://doi.org/10.4018/978-1-5225-1639-2.ch010
[15] Tseng-Chang Yen, Wu-Lin Chen, and Kuo-Hsiung Wang, “Comparison of Three Availability Systems with Warm Standby Components, Detection Delay, and General Repair Times,” Symmetry, vol. 12, no. 3, p. 414, 2020. Crossref, https://doi.org/10.3390/sym12030414
[16] V. V. Singh et al., “Probabilistic Analysis of a Multi-State Warm Standby K-Out of N: G System in a Series Configuration Using Copula Linguists,” Reliability: Theory & Applications, vol. 16, no. 2, pp. 22-39, 2021.
[17] A. Mishra, and Madhu Jain, “Availability of k-out-of-n: F Secondary Subsystem with General Repair Time Distribution,” International Journal of Engineering, Transactions A: Basics, vol. 26, no. 7, pp. 743-752, 2013. Crossref, https://doi.org/10.5829/idosi.ije.2013.26.07a.09
[18] Mangey Ram, and Amit Kumar, “Performability Analysis of a System under 1-Out-of-2: G Scheme with Perfect Reworking,” Journal of the Brazilian Society of Mechanical Sciences and Engineering, vol. 37, no. 3, pp. 1029-1038, 2015. Crossref, https://doi.org/10.1007/s40430-014-0227-y
[19] Vaishali Tyagi et al., “2-Out-of-3: F System Analysis under Catastrophic Failure,” Nonlinear Studies, vol. 26, no. 3, pp. 557-574, 2019.
[20] Mangey Ram, and S. B. Singh, “Analysis of a Complex System with Common Cause Failure and Two Types of Repair Facilities with Different Distributions in Failure,” International Journal of Reliability and Safety, vol. 4, no. 1, pp. 381-392, 2010. Crossref, https://doi.org/10.1504/IJRS.2010.035576
[21] Abdulkareem Lado Ismail, Sanusi Abdullahi, and Ibrahim Yusuf, “Performance Evaluation of a Hybrid Series–Parallel System with Two Human Operators Using Gumbel–Hougaard Family Copula,” International Journal of Quality & Reliability Management, vol. 39, no. 1, pp. 297-315, 2022. Crossref, https://doi.org/10.1108/IJQRM-05-2020-0137
[22] D. K. Rawal, M. Ram, and V. V. Singh, “Study of Reliability Measures of a Local Area Network Via Copula Linguistics Approach,” International Journal of Quality & Reliability Management, vol. 32, no. 1, pp. 97-111, 2015. Crossref, https://doi.org/10.1108/IJQRM-07-2011-0102
[23] Garima Chopra, and Mangey Ram, “Stochastic Analysis of Two Non-Identical Unit Parallel System Incorporating Waiting Time,” International Journal of Quality & Reliability Management, vol. 34, no. 6, pp. 817-832, 2017. Crossref, https://doi.org/10.1108/IJQRM-06-2016-0075
[24] Abdul Kareem Lado, and V.V. Singh, “Cost Assessment of Complex Repairable System Consisting Two Subsystems in Series Configuration Using Gumbel Hougaard Family Copula,” International Journal of Quality & Reliability Management, vol. 36, no. 10, pp. 1683-1698, 2019. Crossref, https://doi.org/10.1108/IJQRM-12-2018-0322
[25] M. Gahlot, Indukala Tripathi, and V.V. Singh, “Performance Assessment of Complex Repairable System Comprising Two Subsystems in a Series Configuration Using Copula Repair Strategy,” International Journal of Mathematics Trends and Technology, vol. 68, no. 6, 33-44, 2022. Crossref, https://doi.org/10.14445/22315373/IJMTT-V68I6P504
[26] A.K. Govil, “Operational Behaviour of a Complex System Having Shelf-Life of the Components under Preemptive Resume Repair Discipline,” Microelectronics Reliability, vol. 13, no. 2, pp. 97-101, 1974. Crossref, https://doi.org/10.1016/0026-2714(74)90560-5
[27] J. R. Arora, “Reliability of Several Standby-Priority-Redundant Systems,” IEEE Transactions on Reliability, vol. 26, no. 4, pp. 290- 293, 1977. Crossref, https://doi.org/10.1109/TR.1977.5220162
[28] P.P. Gupta, and S.K. Sharma, “Availability of a Parallel Redundant Complex System,” IEEE Transactions on Reliability, vol. 27, no. 5, pp. 389-390, 1978. Crossref, https://doi.org/10.1109/TR.1978.5220438
[29] P. P. Gupta, and S.C. Agarwal, “A Parallel Redundant Complex System with Two Types of Failure Under Preemptive-Repeat Repair Discipline,” Microelectronics Reliability, vol. 24, no. 3, pp. 395-399, 1984. Crossref, https://doi.org/10.1016/0026- 2714(84)90462-1
[30] V.V. Singh et al., “Availability Analysis of a System Having Three Units: Super Priority, Priority and Ordinary Under Pre-empty Resume Repair Policy,” International Journal of Reliability and Applications, vol. 11, no. 1, pp. 41-53, 2010.
[31] V.V. Singh, and Hamisu I. Ayagi, “Stochastic Analysis of a Complex System under Preemptive Resume Repair Policy using Gumbel-Hougaard Family Copula,” International Journal of Mathematics in Operational Research, vol. 12, no. 2, pp. 273-291, 2018. Crossref, https://doi.org/10.1504/IJMOR.2018.089681
[32] V.V. Singh, and D.K. Rawal, “Availability, MTTF and Cost Analysis of Complex System Under Preemptive Resume Repair Policy Using Copula Distribution,” Pakistan Journal of Statistics and Operation Research, vol. 10, no. 3, pp. 299-312, 2014. Crossref, https://doi.org/10.18187/pjsor.v10i3.724
[33] Fung-Yee Chan, Lai K. Chan, and Gwo Dong Lin, “On Consecutive-k-out-of-n: F Systems,” European Journal of Operational Research, vol. 36, no. 2, pp. 207-216, 1988. Crossref, https://doi.org/10.1016/0377-2217(88)90427-4
[34] K.G. Ramamurthy, “Reliability Function of Consecutive-K-Out-of-N Systems for the General Case,” The Indian Journal of Statistics, Series B, vol. 59, no. 3, pp. 396-420, 1997.
[35] Xiaolin Liang, Yinfeng Xiong, and Zehui Li, “Exact Reliability Formula for Consecutive-K-Out-of-N Repairable Systems,” IEEE Transactions on Reliability, vol. 59, no. 2, pp. 313-318, 2010. Crossref, https://doi.org/10.1109/TR.2010.2046790
[36] Rui Peng, and Hui Xiao, “Reliability of Linear Consecutive-K-Out-of-N Systems with Two Change Points,” IEEE Transactions on Reliability, vol. 67, no. 3, pp. 1019-1029, 2018. Crossref, https://doi.org/10.1109/TR.2018.2829709
Garima Chopra, "Stochastic Model for Linear Consecutive 2-out-of-3: G System with Pre-emptive Priority Resume Repair," International Journal of Mathematics Trends and Technology (IJMTT), vol. 69, no. 2, pp. 1-14, 2023. Crossref, https://doi.org/10.14445/22315373/IJMTT-V69I2P501